On Saturday May 6th, 3 members of the East Pittsburgh branch helped pave a local church parking lot. Before paving, the parking lot had a multitude of cracks and imperfections that desperately needed renovations. First, there was a crew that picked the small weeds and picked up any rocks found on the parking lot. Afterwards we used buckets of liquid concrete to pave, in which there were some people designed to mix the concrete so the texture was even. Then we used the mixture to pave the parking lot. After 4 hours of paving, and around 80 large buckets of liquid concrete we finally completed paving the huge parking lot.
hours: Joshua Chen(4 hours), Xin Yan Li(4 hours), Jason Li(2.5hours)